Finger Lakes history · regional story
Developing historyRock, cement, and the trains at Portland Point
Court records, a factory inventory, and old timetables trace parts of a working landscape on Cayuga Lake. A railroad historian's memory adds the people aboard the morning train.
Research status
This history is still developing.
Parts of this account remain unresolved. Here is what the sources support, what is uncertain, and what we are looking for next.
About this review. Written and source-checked with AI assistance under an owner-authorized editorial process. This is not a personal review by Riley or an independent historian. Sources and unresolved questions are listed below; corrections are welcome.
- What the records establish
- Period sources document quarry work in 1901, a quarry-to-factory tramway, the plant's location and raw materials, the company's account of a 1918 takeover and later remodeling, and specific passenger services in 1915 and 1927. Trice's account provides separately attributed recollection of worker ridership.
- What remains uncertain
- The court does not explain how the tramway worked. This story does not adopt later claims that it was overhead or gravity-powered, name a manufacturer, or assign an exact surveyed length. The timetables do not identify a dedicated worker service or prove uninterrupted operation from 1909 to 1927. The 1926 inventory cannot be read as a plan of the original 1901 works.
- What we are researching next
- Engineering drawings, company correspondence, employee tickets, payrolls, housing records, and local timetable folders could help connect the machinery and train schedules to individual working lives. The missing local folder is also needed to establish Portland Point's precise service in April 1927.
The rock had to get from the quarry to the factory. At Portland Point, a 1913 court opinion records Cayuga Lake Cement Company building a tramway for that job. The court described the distance between the two as roughly a quarter to half a mile. It was an approximation in a legal case, not an engineering measurement, but it places the quarry and the mill in a connected operation. [1]
An earlier opinion in the same case puts the company's quarry excavation in Lansing in September 1901. A federal industrial survey published in 1905 locates the Cayuga Portland Cement Company plant at Portland Point on Cayuga Lake's east shore and identifies its raw materials as Tully limestone and shale from the Hamilton group. [2][3]
The mill changed substantially over the next two decades. A 1926 corporate filing, later reproduced in the Congressional Record, says the original mill began production in 1901. It dates Pennsylvania Cement Company's takeover to 1918 and says the plant was almost entirely remodeled afterward. The filing's account describes a later version of the works, not an unchanged survivor of the first year. [4]
Its inventory lists crusher houses, rock storage, conveyor structures, mills, kilns, storage buildings, and dwellings. The list connects the manufacturing equipment with buildings intended for housing, though it does not tell us who occupied each dwelling or what their lives were like. It also cannot settle the fate of the earlier tramway: a named conveyor in 1926 is not proof that a particular piece of 1901 equipment had been removed or replaced. [4]
The railway supplied another connection. A December 1915 Lehigh Valley timetable shows weekday Train 306 leaving Ludlowville late in the afternoon, stopping at Portland Point, and continuing to Ithaca. An April 1927 timetable shows a daily-except-Sunday short run from Ludlowville to Ithaca, but its condensed table does not provide a Portland Point time. These are two dated service patterns, not proof that the same service ran without interruption between them. [5][6]
Herbert Trice remembered workers on the morning journey. Writing later about family trips in the late 1920s, the railroad historian recalled male passengers bound for Portland Point and Ludlowville occupying seats on the Auburn and Ithaca train. His memory brings commuters into the account. It does not establish their employers, or prove that the railway created a dedicated cement-company shuttle. [7]
The records leave an outline of work at Portland Point: rock moving toward the mill, machinery and dwellings in the company inventory, and passengers traveling along the lake. The workers' names, their households, and the details of the quarry transport still need their own records.
Sources
- Mahoney v. Cayuga Lake Cement Co., New York Court of Appeals, April 15, 1913, 208 N.Y. 164, official reporter p. 165, opening statement of facts. Linked version is a transcription, not a reporter facsimile.
- Mahoney v. Cayuga Lake Cement Co., Appellate Division, May 6, 1908, 126 A.D. 164, official reporter p. 165, opening statement of facts. Linked version is a transcription.
- Edwin C. Eckel, Cement Materials and Industry of the United States, USGS Bulletin 243, 1905, printed pp. 260–261 / PDF pp. 271–272, Cayuga Portland Cement Company paragraph and raw-material analysis. The preceding bucket-cableway description concerns a different company at Smiths Landing, not Portland Point.
- Congressional Record, Senate, March 24, 1930, reproducing Pennsylvania-Dixie Cement Corporation's 1926 listing application. Printed pp. 5998–5999 / PDF pp. 41–42, Portland Point mill history; Exhibit B, printed pp. 6004–6005 / PDF pp. 47–48, plant inventory.
- Lehigh Valley Railroad public timetable, December 15, 1915, Table 22, “Auburn and Ithaca Branch,” printed/PDF p. 19, Train 306 column.
- Lehigh Valley Railroad public timetable, April 24, 1927, Table 21, “Auburn & Ithaca Branch,” printed/PDF p. 12, Train 306 column and symbol key.
- Herbert V. Trice, The Gangly Country Cousin: The Lehigh Valley's Auburn Division, printed pp. 150–151 / PDF pp. 151–152, first-person recollection of weekday journeys and worker passengers.